Answer:
e. $42,857.14
Explanation:
The computation of the break-even level of earnings before interest and taxes between these two options is shown below:
(EBIT) ÷ (Number of shares) = (EBIT - Interest) ÷ Number of shares
(EBIT) ÷ (75,000 shares) = (EBIT - $20,000) ÷$40,000
40,000 × EBIT = 75,000 × EBIT - $1,500,000,000
35,000 × EBIT = $1,500,000,000
After solving this,
The EBIT would be $42,857.14
The interest expense
= $320,000 × 6.25%
= $20,000
False....Get a A lol your welcome
Answer:
The correct answer is option c.
Explanation:
The price of Kate's breakfast special is $5.
The average variable cost is $3.95.
The average fixed cost is $1.25.
The average total cost
= $3.95 + $1.25
= $5.20
The price is not covering the average total cost but it is covering the average variable cost. The firm can continue operating in the short run but stop production in the long run.
The total cost of direct labor for the month will be $ 49350, if the company has budgeted production at 940 units for the month, each unit requires 3.5 hours of labor to produce and the average labor rate is $15 per hour.
Explanation:
The given is,
Total units produced in a month
= 940 unit per month
Time for each unit
= 3.5 unit per hour
Labor rate = $15 per hour
Step:1
Total Labor working hours for 940 units,
= Total units × Time for each unit
= 940 × 3.5
= 3290 hours
Step:2
Labor cost total working hours
= Total Labor working hours × Labor cost per hour
= 3290 × 15
= $ 49350
Result:
The total cost of direct labor for the month will be $ 49350, if the company has budgeted production at 940 units for the month, each unit requires 3.5 hours of labor to produce and the average labor rate is $15 per hour.
Answer:
29.71 per machine-hour
Explanation:
Buker corporation has an estimated machine hours of 74,000
The estimated variable manufacturing overhead is 7.67 per-machine hour
The estimated total fixed manufacturing overhead is $1,630,960
The first step is to calculate the estimated overhead cost
= (74,000×7.67) + $1,630,960
= 567,580 + $1,630,960
= $2,198,540
Therefore, the predetermined overhead rate can be calculated as follows
Predetermined Overhead rate= Estimated manufacturing overhead cost/Estimated machine hours allocated
= $2,198,540/74,000
= 29.71 per machine-hour
Hence predetermined overhead rate for the recently completed year was closest to 29.71 per machine-hour