I think the answer is c. I just did that edginunity
Answer:
Defects in design, maintenance letdowns, lack of training, economy dealings, and blunders in operations.
Explanation:
The design definitely was not appropriate, and there was lack in maintenance. Also there was lack of training, and blunders in operations. The project was not sound economically as well. And, you should know that problem arose due to water leakage. And that was due to mainly maintenance failure, which you can study in deep through Material Science. Lack of design is part of industrial design and others are part of management.
1. go back to the feedback you submitted
2.Locate the order, and then click remove
3.select a reason for the removal and click to remove the feedback button.
(But why would you write a rude comment in the first place to begin with?)
Answer:
Assuming that the distance from Chicago Illinois to Copenhagen Denmark is 4200 miles and the speed of light is 186,400 miles per second;
The time difference 10 milliseconds in the session log and the calculated time of 22.5 milliseconds.
Explanation:
The TCP three way handshake connection time is determined by the distance between the connecting hosts and the speed of the link.
If the distance between the hosts is 4200 miles and the link speed is an assumed speed of light 186,400 miles per second, the TCP session time is;
Time = distance/ speed
Time = 4200 / 186400
Time = 0.0225 seconds. = 22.5 milliseconds
But Johnny's TCP session time is 10 milliseconds, therefore Johnny is lying about the source IP address from Copenhagen Denmark.