Answer:
Explanation:
He’s wright SS7G5 The student will locate selected features in
Southwestern Asia (Middle East).
a. Locate on a world and regional political-physical map:
Euphrates River, Jordan River, Tigris River, Suez Canal,
Persian Gulf, Strait of Hormuz, Arabian Sea, Red Sea, and
Gaza Strip.
b. Locate on a world and regional political-physical map the
nations of Afghanistan, Iran, Iraq, Israel, Saudi Arabia, and
Turkey
Hi, you haven't provided the programing language in which you need the code, I'll just explain how to do it using Python, and you can apply a similar method for any programming language.
Answer:
def rightMost(num):
lenNum = len(str(num))
rightNum = num%(10**(lenNum-1))
print(rightNum)
return(rightNum)
Explanation:
In this function we receive an integer number, then we find how many digits this number has, and finally, we find the rightmost digits; the main operation is modulo (takes the remainder after a division), what we want is to take all the digits except the first one, for that reason we find the modulo of the number when divided by ten to the power of the length of the number minus one, for example, if the number is 2734 we divided by 10^(4-1), where four is the length of the number, this way we get 2734/1000 and the module of it is 734.
<span>If a user name can have seven letters (with no distinction between upper and lower case), and if a letter can be repeated, then the maximum number of names is 26x26x26x26x26x26x26, or 8,031,810,176. That is, slightly more than eight billion names are possible.</span>
Answer:
The correct answer is C) With respect to PERT and CPM, slack is the amount of time a task may be delayed without changing the overall project completion time.
Explanation:
The CPM (Critical Path Method) method is frequently used in the development and control of projects whose tasks have a fixed duration while the PERT (Program Evaluation and Review Techniques) method is a set of techniques with the same purpose but that allows to work with tasks with estimated probability duration but not deterministic.
Both methods are based on developing a complete scheme that includes all the tasks of a project linked to each other according to their sequence, determining the duration and analyzing different ways of reconfiguring the task planning to optimize the use of the resources of according to the general objectives of the project.
There are tasks that to start performing them must have been completed one or more previous tasks. The overall duration of the project is determined by the Critical Path, which is the sequence of tasks of greater duration. The tasks belonging to the critical path have to be carried out with special care because delays in them would cause delays in the total achievement of the project. That is why these tasks have no slack.
The rest of the tasks have some slack, which is determined by the time that a previous task can be delayed without delaying the total time of completion of the project, that is, not exceeding the duration determined by the critical path.
That is that why we say that the <em>slack</em><em> is the amount of time a task may be delayed without changing the overall project completion time</em>.