1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
IRISSAK [1]
3 years ago
10

What is the term for the part of a browser responsible for reading and processing programming languages?

Computers and Technology
1 answer:
koban [17]3 years ago
4 0
The interpreter is the answer.
You might be interested in
Physical Geography of the Middle East
vagabundo [1.1K]

Answer:

Explanation:

He’s wright SS7G5 The student will locate selected features in

Southwestern Asia (Middle East).

a. Locate on a world and regional political-physical map:

Euphrates River, Jordan River, Tigris River, Suez Canal,

Persian Gulf, Strait of Hormuz, Arabian Sea, Red Sea, and

Gaza Strip.

b. Locate on a world and regional political-physical map the

nations of Afghanistan, Iran, Iraq, Israel, Saudi Arabia, and

Turkey

3 0
3 years ago
When computers connect to one another to share information, but are not dependent on each other to work, they are connected thro
Andrej [43]
Peer-to-peer would be my best bet. Hope this helps. 
3 0
3 years ago
Read 2 more answers
Use the modulo operator (%) to get the desired rightmost digits. Ex: The rightmost 2 digits of 572 is gotten by 572 % 100, which
uranmaximum [27]

Hi, you haven't provided the programing language in which you need the code, I'll just explain how to do it using Python, and you can apply a similar method for any programming language.

Answer:

def rightMost(num):

   lenNum = len(str(num))

   rightNum = num%(10**(lenNum-1))

   print(rightNum)

   return(rightNum)

Explanation:

In this function we receive an integer number, then we find how many digits this number has, and finally, we find the rightmost digits; the main operation is modulo (takes the remainder after a division), what we want is to take all the digits except the first one, for that reason we find the modulo of the number when divided by ten to the power of the length of the number minus one, for example, if the number is 2734 we divided by 10^(4-1), where four is the length of the number, this way we get 2734/1000 and the module of it is 734.

5 0
3 years ago
Suppose that a local area network requires seven letters for user names.​ lower- and uppercase letters are considered the same.
Naddik [55]
<span>If a user name can have seven letters (with no distinction between upper and lower case), and if a letter can be repeated, then the maximum number of names is 26x26x26x26x26x26x26, or 8,031,810,176. That is, slightly more than eight billion names are possible.</span>
6 0
3 years ago
With respect to PERT and​ CPM, slack A. is a task or subproject that must be completed. B. marks the start or completion of a ta
Wewaii [24]

Answer:

The correct answer is C) With respect to PERT and​ CPM, slack is the amount of time a task may be delayed without changing the overall project completion time.

Explanation:

The CPM (Critical Path Method) method is frequently used in the development and control of projects whose tasks have a fixed duration while the PERT (Program Evaluation and Review Techniques) method is a set of techniques with the same purpose but that allows to work with tasks with estimated probability duration but not deterministic.

Both methods are based on developing a complete scheme that includes all the tasks of a project linked to each other according to their sequence, determining the duration and analyzing different ways of reconfiguring the task planning to optimize the use of the resources of according to the general objectives of the project.

There are tasks that to start performing them must have been completed one or more previous tasks. The overall duration of the project is determined by the Critical Path, which is the sequence of tasks of greater duration. The tasks belonging to the critical path have to be carried out with special care because delays in them would cause delays in the total achievement of the project. That is why these tasks have no slack.

The rest of the tasks have some slack, which is determined by the time that a previous task can be delayed without delaying the total time of completion of the project, that is, not exceeding the duration determined by the critical path.

That is that why we say that the <em>slack</em><em> is the amount of time a task may be delayed without changing the overall project completion time</em>.

8 0
3 years ago
Other questions:
  • True False The explicit location always tells you where users are located when they type the query.
    10·2 answers
  • What is one way for an entrepreneur to decrease risk?
    8·1 answer
  • Your organization will be handling market trades. You will be required to verify the identify of each customer who is executing
    8·1 answer
  • Ruby is creating a presentation. She wants each slide displayed at intervals of five seconds. Which feature in the presentation
    6·2 answers
  • When selecting text in word, holding down the ctrl key while clicking the mouse button will select the?
    15·1 answer
  • How did the invention of the printing press lead eventually to an increase in the diversity of religious expression?
    7·1 answer
  • Describe how mendeleev organized the elements into rows and columns in his periodic table.
    12·1 answer
  • Which key you should you press to leave the cell as it orginally was
    14·2 answers
  • Identify 5 products/services needed by the people in our current situation.<br>​
    6·1 answer
  • Selection Sort List the resulting array after each iteration of the outer loop of the selection sort algorithm. Indicate the num
    10·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!