1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
jeyben [28]
3 years ago
5

Rona mixes 2 pounds of meat with some chopped vegetables to make a mixture. She divides the mixture into 4 equal portions. Each

portion weighs 3 pounds. Which equation and solution shows the total amount of chopped vegetables she used in the mixture?
Mathematics
1 answer:
vodomira [7]3 years ago
6 0
Well if each portion is 3 pounds and there is 4 portions all together it would be 12 pounds. you already know know that the meat is 2 pounds so you subtract 2 from the whole and you are left with 10. The chopped vegetables are 10 pounds in total.
The answer is
4x3=12-2=10

You might be interested in
The perimeter of the garden is 10x + 8. find the missing side length
Fantom [35]
Subtract the sum of the known sides from the perimeter to find the length of the missing side.
6 0
3 years ago
Kesha drives 36miles in 48 minutes.keeping the same rate she drives ____ in 12 minutes
AnnyKZ [126]

Answer:

24

Step-by-step explanation:

subtract 48 from 36 and that equals 12 than add 12=24

4 0
3 years ago
Which simulation could NOT be used to simulate a baby being born male or female?
yuradex [85]
C) a spinner with 7 equal sections.
6 0
3 years ago
Read 2 more answers
How many meters are in 12 kilometers?
kompoz [17]
That is 12000 sooo that is the answer
8 0
3 years ago
The Robotics Manufacturing Company operates an equipment repair business where emergency jobs arrive randomly at the rate of thr
cluponka [151]

Answer:

The correct answer is:

  • \lambda=0.375 \ jobs \ per \ hour
  • \mu=0.5 \ jobs \ per \ hour

Step-by-step explanation:

The given values are:

Service time varies,

Repair time = 2 hours

Standard deviation = 1.5 hours

Robotics uses per hour cost,

= $35

Company's cost per hour,

= $28

(a)

⇒ Arrival rate = Jobs per hours

then,

                       = \frac{8 \ hours}{3 \ jobs}

                       = 2.666 \ hours \ per \ job

The jobs per hour will be:

⇒  \lambda=\frac{1}{2.666}

       =0.375

(b)

⇒ Service rate = jobs per hour

then,

                      μ = \frac{1 \ repair \ job}{2 \ hours}

                         = 0.5 \ jobs

7 0
3 years ago
Other questions:
  • Solve for y?<br> 272=34y
    9·2 answers
  • Make n the subject of the formula<br>a=mn<br>    10
    15·1 answer
  • Assume that a student attends a four-year college with tuition costs of $20,000 per year, room and board costs of $5,000 per yea
    14·1 answer
  • PLEASE HELPPP ASAP 50 POINTS !!!!!!!!!!!!!!!!!!! PIC BELOW
    10·2 answers
  • A train that is 80 meters long travels 240 meters in 6 seconds. How many seconds would it take the train to pass through a 480 m
    11·2 answers
  • Division problems to solve for 4th grade
    8·1 answer
  • A SIX PACK OF PAPER TOWELS FOR $6.50 OR SIX ROLLS FOR 1.25
    12·2 answers
  • What is the answer to number 4
    11·1 answer
  • A heavy piece of equipment has wheels on one side and legs on the other as shown in the diagram below.
    11·1 answer
  • If a cube has a side length of 6.5 inches, which would be the cube's volume?
    9·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!