Answer:
Step-by-step explanation:
Given that,
μ = 25.1
σ = 0.26
a) since standard deviation is ideal measure of dispersion , a combination of control chart for mean x and standard deviation known as

Chart is more appropriate than
and R - chart for controlling process average and variability
so we use
charts
b)
n = 11
we have use 2 σ confidence
so, control unit for
chart are
upper control limit = 
lower control limit = 
control limit = μ
μ = 25.1
upper control limit =

lower control limit =

Upper control limit and lower control limit are in between the specification limits , that is in between 24.9 and 25.6
so, process is in control
c) if we use 3 sigma limit with n = 11
then
upper control limit = 

lower control limit = 

control limit is 25.1
Then, process is in control since upper control limit and lower control limit lies between specification limit
So, process is in control
The proper answer for that is <span>278.842</span>
Answer:
x = 35°
Step-by-step explanation:
The question is as following
cos x = sin(20 + x)° and 0° < x < 90° , find X?
==============================================
cos x = sin(20 + x)°
sin and cos are co-functions,
which means that: cos x = cos [90 - (20 + x)]
∴ x = 70 - x
∴ 2x = 70
∴ x = 35°
======================
Note: cos θ = sin ( 90 - θ )
We need to define our outcomes and events.
Finding the probability<span> of each event occurring
separately, and then multiplying the probabilities is the step to <span>finding
the probability</span> of two
independent events that occur in
sequence.
</span>
<span>
To solve this problem, we take note of this:</span>
The roll of the two dice are denoted by the pair
(I, j) ∈ S={ (1, 1),(1, 2),..., (6,6) }
Each pair is an outcome. There are 36 pairs and each has
probability 1/36. The event “doubles” is { (1, 1),(2, 2)(6, 6) } has
probability p= 6/36 = 1/6. If we define ”doubles” as a successful roll, the
number of rolls N until we observe doubles is a geometric (p) random variable
and has expected value E[N] = 1/p = 6.
Answer:
416.87, you subtract all from gross pay.
Step-by-step explanation:
546.54-66-21.86-33.89-7.92=416.87