Answer:
has all of these features.
Explanation:
This can be said to be a computerized system that are been used as information connection which in many cases are used in monitoring, and controlling of complex system primary used in manufacturing system and also the flow of data in floors that manufacturing are been mostly done. That it is said that a manufacturing execution system posses all the above listed characteristics ranging from providing info for job priority using relevant rules to adjusting lead time to provide customers needs. They are also seen to compile certain bill of materials, resource management and scheduling, preparing work in rogress reports and tracking production lots.
Answer:
$62
Explanation:
Given that
Units = 1000
Price per unit = 60
Future price drawn/loss = 2000
Thus
1000 (x - 60 ) = 2000
Where x = future price
x - 60 = 2000/1000
x - 60 = 2
x = 60 + 2
x = $62
Thus, future price that will allow the withdrawal of 2000 is $62.
Note, each $1 increase in future prices leads to $1000 gain. When future price therefore increases by $2, gain gotten will be therefore $2000 and this can be withdrawn. Intial price was $60, thus, future for 2000 withdraw = 60 + 2 = $62.
Answer:
(a)Dawson Company $42.00
(b)McBride Company $41.40
Explanation:
The amount of FUTA taxes to be paid on Mirer's wages by the two companies are:
(a)Dawson Company $42.00
(7000*0.6%) = $42.00
(b)McBride Company $41.40
(6900*0.6%) =$41.40
Answer:
c) a firm does not have sufficient time to change the level of use some of its inputs.
Explanation:
The definition of short-run in economics is not a term to be used for a specific certain period of time but it means that the period of time is too short that the firms cannot change the level they are using of some of their inputs or costs. It means they do have fixed costs they cannot change. For example, all machinery installed, a yearly rent paid, electricity or others that the firm cannot change unless there is sufficient time. In a short period of time, it will have those costs anyway. The firm cannot change the level of that input. And it is short run of at least one input. It may be many. But it is not necessary to have all inputs unchanged to consider that period of time as short-run.
However, firms can change level of inputs if they have more time. That is cost the long run. All costs are variable costs when we are in long run.