Answer:
Let the computer warm up to room temperature before turning it on.
Explanation:
The laptop has been shipped to the user's home when he were at work and found on the deck. Outside it is really cool and he don't remember how long it has been there. Then, the user open his laptop and want to know whether it is functioning properly. Instead, let the machine warm up while switching it on to room temperature.
When a computer is still in a cold climate, they have to let it heat up to room temperature apx. 6-24 hours before switching it on. Otherwise, its heat the elements generate could cause water moisture within the laptop. That water could then harm elements of the system.
Answer:
Option a, b, d, f, and j is legal method calls.
Explanation:
In the given question some information is missing, that is the method definition which can be described as follows:
Method definition:
int x =2, y=3; //defining integer variable
int mathMethod (int x) //method definition
{//method body
int z=x+y; //calculate value
return z; //return value
}
In the given question option a, b, d, f, and j is legal, because these options follow the correct syntax, and other option were incorrect which can be defined as follows:
- In option c, It is illegal because it accepts only one parameter.
- In option e, It is accepts long number, that's why it is illegal.
- In option g, It accepts float value, that's why it is illegal.
- In option h, It doesn't accepts any parameter.
- In option i, It isn't use in method.
Answer:
The formula to enter in E14 is as follows:
=DAYS(D14,$E$10)
Explanation:
Required
Formula to calculate the number of days between E10 and D14
The syntax to do this is:
=DAYS(end_date,start_date)
So, we have:
=DAYS(D14,E10)
The question requires a mix of relative and mixed references because cell E10 will be constant in calculating the difference for dates in other cells.
In other words, the initial date is constant for all
So, the update formula is:
=DAYS(D14,$E$10)
Notice the $ between in E10; this represents mixed referencing
When dragged to E15 till E68, the formulas in the respective cells will be:
=DAYS(D15,$E$10) .............................. =DAYS(D68,$E$10)
Answer:
it is used to view incidents recorded in the Application, Security, and System logs
Explanation: pls make my answer brainliest
C you should believe in yourself and your abilities