1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
xeze [42]
3 years ago
9

I need a little help on this I have a hole bunch more to have you guys answer for me...

Mathematics
2 answers:
Allisa [31]3 years ago
3 0
Well if the picture of the cheese equals to one cheese then you should just be able to add all the cheeses in the graph to get the amount of stinky cheese there is and when you add all of them you get 12 pieces
so the answer would be 12 pieces of cheese
Andru [333]3 years ago
3 0
The answer would be 12 pieces
You might be interested in
!!!!!1ILL GIVE 25 POINTS AND BRAINLIEST JUST PLEASE B((((((((((((((!!!!!
Aleks04 [339]

Answer:

C

Step-by-step explanation:

7 0
3 years ago
Read 2 more answers
Graph.<br> Y= 5/3x-4<br><br> (Please include a picture) &lt;3
nevsk [136]

See attach file

y intercept = -4

slope= 5/3

6 0
3 years ago
Read 2 more answers
Last week, Bill ran 900 meters on each of 3 days. Between last week and this week, bill wants to run a total of 6 kilometers. Ho
laila [671]
For the 3 days he ran a total of :  3 * 900 = 2700 meters.

1000 meters = 1 kilometers

2700 meters = 2700 / 1000 = 2.7 kilometers.

Between last week and this week, Bill ran a total of 6 kilometers.

How far he ran this week = 6 - 2.7 = 3.3 kilometers.

Option C.
7 0
3 years ago
Why is the number of operators per shift multiplied by approximately 4.5 to obtain the total number of operators required to run
4vir4ik [10]

I believe you meant "why is the number of shifts multiplied by approximately 4.5 to obtain the total number of operators required to run the plant"

Answer and Explanation:

There are 3 shifts per day, 49 weeks per year and 5 shifts per operator per week

To get total number of operators required to run the plant, we multiply number of shifts in a year by number if operators per shift.

49 weeks×5 shifts= 245 shifts per operator per year

365×3 shifts= 1095 shifts per year

1095/245=4.5 operators per shift

total number of operators required to run the plant(per day) = 4.5×3= 13.5 approximately 14

total number of operators required to run the plant(per year) =4.5×1095=4927.5 approximately 4928

3 0
3 years ago
A diameter of the sphere is MT CT CD
iren2701 [21]

Answer:

CT

Step-by-step explanation:

The diameter is the longest possible line through the sphere and passes through the center.

3 0
3 years ago
Other questions:
  • 1/3x+3=13<br> what is the answer for x
    10·2 answers
  • The pine scrub rail trial is 72 miles long. if the willy-nilly bike club rides 18 miles per day, how many days will it take them
    12·1 answer
  • For the linear equation, find the product of 8 and the linear equation, and solve both equations for y.
    13·1 answer
  • Explain how mental math can be used to estimate a 15% tip on a taxi ride that costs $23.25
    14·2 answers
  • How does scale factor change the area?
    6·1 answer
  • While chasing its prey, a cheetah is running slowly and then increases its speed by 50.6 miles per hour to reach a top speed of
    14·1 answer
  • Use the Distributive Property to rewrite the algebraic expression. 5(2x + 7)
    13·1 answer
  • Anyone know the answer to this?
    10·1 answer
  • Find and x and y <br> PLEASE HELP
    11·1 answer
  • PLEASE HELP WILL MARK BRAINLIEST THANK YOU
    7·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!