we know the perimeter is 24, and is an equilateral triangle, so it has three equal sides, so each side is 24 ÷ 3 = 8.
Answer: It would take 9 hours for 4 painters to paint 720 feet of fence.
Step-by-step explanation:
1.) Calculate the time needed to paint the 720 ft fence with 2 painters.
a.) Divide 720 by 280 to get how many times greater 720 is than 280.
720 / 280 ≈ 2.57
b.) Multiply the time needed to paint the 280 ft fence with 2 painters by 2.57.
7 * 2.57 ≈ 18
2.) Calculate the time needed to paint the 720 ft fence with 4 painters.
a.) Assuming that each painter paints the same amount of fence, divide the time in half, as 4 painters is double the original amount, so it would take half of the time.
18 / 2 = 9
Step-by-step explanation:
x = number of cans.
790 total cans and bottles.
790 - x = number of bottles.
y = weight of the cans and bottles in ounces.
y = 14x + 70×(790 - x) = 14x + 55300 - 70x = 55300 - 56x