4^2 + b^2 = 12^2
16 + b^2 = 144
B^2 = 144-16
B^2 = 128
B= 11.3
Answer:
Kevin is going to be able to have enough money for the concert the fastest
Philip needs at least 4 weeks
Kevin needs at least 3 weeks
Step-by-step explanation:
<u>Philip</u>
- $8.75/hour * 6 hours/weekend * 1 weekend/week = $52.5/week
Let's call x to the number of weeks Philip needs to reach $225.
52.5*x + 45 = 225
52.5*x = 225 - 45
x = 180/52.5
x = 3.43
He needs at least 4 weeks
<u>Kevin</u>
- 3 hours/day * $7.5/hour *3 days/week = $67.5/week
Let's call y to the number of weeks Kevin needs to reach $225.
67.5*y + 30 = 225
67.5*y = 225 - 30
y = 195/67.5
y = 2.9
He needs at least 3 weeks
The 2nd one. Elsa should subtract the numerators instead of adding them carson’s pumpkin weighs 1/4 pound
Slope = "rise over run" the difference in y values divided by the difference in x values
= 6/-3 = -2 = m. It's negative because as x increases, y decreases
plug that into the point slope formula, with either point. generally use the most simple point
y-h= m(x-k) where m= -2 and (k,h) = (2,-2)
y+2 = -2(x-2)
simply if you want
Y = -2x +4 -2 = -2x +2
or
2x +y = 2
Answer:
Copy the second line segment with one endpoint at the same endpoint of the first line segment.
c is correct a is wrong