Train one is going 75 m/s, train two is going 60 m/s, and train three is going 65 m/s.
Explanation:
For number one you could use the slope formula y2-y1/x2-x1, or you could simply just view it from the table that every second that’s passes the distance goes up another 75 meters. This means it would be 75 meters per second.
For the second one it’s a positive correlation that’s related meaning at every whole second (1,2,3...) the line will pass through it, so all you have to do is look at the left and see how much it’s going up by because we know it’s going up by the same amount each time.
For this case we have a factorized quadratic equation. We equal each factor to zero and thus find the roots:

Subtracting 5 from both sides we have:

Thus, the first solution of the equation is:

On the other hand we have:

Adding 3 to both sides:

Thus, the second solution of the equation is:

Answer:
The solutions of the equation are:

4x - 9 = 143
4x = 152
x = 38
The answer is A based off point slope form