If the 316 is supposed to be 3/16 and the 34 is supposed to be 3/4, then your answer is 2.
Answer:
Look at the graph, on the left side it says snow on the ground, and it starts on 5, as the storm continued more fell. nvm.
Step-by-step explanation: The answer to your question is 5, because that is how much is on the ground at the beggining.
Answer: 12k + 5
Hope this helps:)
Answer:
Sample size minimum is 60
Step-by-step explanation:
given that you want to create a 99% confidence interval with a margin of error of .5.
The population standard deviation is equal to 1.5
i.e. 
Confidence level = 99%
Since population std deviation is known, we can use Z critical value for finding margin of error
Z critical value for 99% = 2.58
Margin of error = 
Equate this to 0.5 and solve for n
