Answer:
Answer to question a = 95.4
Answer to question b = UCL = 96.07
LCL = 94.73
Answer to question c = Process is still in control
Step-by-step explanation:
a. The computation of estimate mean is as shown below:-
= 95.4
b. The computation of Upper Control Limit (UCL) and the Lower Control Limit (LCL) for the manufacturing process is shown below:-
= 95.4 + 0.67082
= 96.07
= 95.4 - 0.67082
= 94.73
c. The explanation is shown below:-
From the above calculation we can see that the sample lies between LCL AND UCL that is (94.73 ,96.07) ,
The Process is still in control
-35 angle degree I hope it helps
Answer:
ANSWER BELOW
Step-by-step explanation:
If the door is 9 x 2 ft (18 sq ft):
12 x 18 = 216 sq ft. (Front face including the door)
216 sq ft - 18 sq ft = 198 (Front face not including the roof or door)
For the roof, the formula is h b/2:
So if the height is 4 and the base is 18, the area of the roof is 36.
To find the total area, you must add the area of the front face and the roof (without the door).
198 + 36 = 234 sq ft
Have a wonderful day my friend!
<span>A 2% solution of chlorohexidine added to 126 oz of water. The total oz 128.
Solute: chlorohexidine, 2%=0.02
solvent: water (0%)
Concentration, C, volume V
CV=c1v1+c2v1
128C=0.02*2 + 0.00*126 = 0.04
Concentration
C=0.04/128 = 0.0003125 = 0.03125%</span>