Answer:
employ ability assessments and the ability to perform tasks
Explanation:
Answer:
Intel produces a series of unlocked CPU's that can be overclocked. These CPUs are from the "K" or "X" series. Example: Intel Core i9-9900K, Intel Core i9-10940X.
These are the few things that are to be kept in mind while overclocking:
-Motherboard: Motherboard should support overclocking. Example: Intel Z series, most AMD motherboards.
-Cooler: Boosting the clock speed increases the temperature. The cooler has to be upgraded to keep the temperatures low. Example: Water-cooled. Also, the heat sink has to be checked if it's working properly.
-Be ready to test your system in BIOS. Make sure the temperature, voltage, memory speed is stable for the set clock speed.
Explanation:
The correct answer is letter b
Answer:
The formula to enter in E14 is as follows:
=DAYS(D14,$E$10)
Explanation:
Required
Formula to calculate the number of days between E10 and D14
The syntax to do this is:
=DAYS(end_date,start_date)
So, we have:
=DAYS(D14,E10)
The question requires a mix of relative and mixed references because cell E10 will be constant in calculating the difference for dates in other cells.
In other words, the initial date is constant for all
So, the update formula is:
=DAYS(D14,$E$10)
Notice the $ between in E10; this represents mixed referencing
When dragged to E15 till E68, the formulas in the respective cells will be:
=DAYS(D15,$E$10) .............................. =DAYS(D68,$E$10)
Answer:
D. Identify the problem.
Explanation:
There are six steps or stages in computer system troubleshooting. They are,
1. Identify the problem: In the stage of troubleshooting, the user is interviewed to get a description of the problem. Reproducing the problem is essential to confirm the described problem of the system before moving to the next stage.
2. Establish a theory of probable cause: when the problem is identified, a list of the possible cause of the problem is made.
3. Test the theory to determine a cause: each items on the list of possible cause of the problem is tested to confirm its actual cause.
4. Resolve the problem.
5. Verify full system functionality
6. Document the findings, actions and outcomes.