1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Zinaida [17]
4 years ago
7

Do equation per tile plz that's all and thank you

Mathematics
1 answer:
igor_vitrenko [27]4 years ago
4 0
B= 95.94 %  6 = 15.99
t=  b % 20 = 0.7995
You might be interested in
Please help its timed ​
stiks02 [169]

Answer:

This seems like a live quiz

Step-by-step explanation:

no live quizzes aloud on Brainly

7 0
3 years ago
Three times a number subtracted by 3 is 20
nignag [31]

Answer:

3x - 3 = 20

Step-by-step explanation:

Times is a word that represents multiplication. A number can be represented by x.

3x - 3 = 20

Solving this:

3x - 3 = 20     1. Add 3 on both sides

3x = 23           2. Divide by 3 on both sides

x = 7 2/3

3 0
3 years ago
Given: ΔABC, AB ≅ BC<br> BE− median of ΔABC<br> m∠ABE = 40°30'<br> Find: m∠ABC, m∠FEC
Nikitich [7]
I think angle abc is 80° and angle fec is 90°

Explanation:

Since angle abe is 40° just double it to get abc

And fec is just a 90° angle

8 0
3 years ago
Read 2 more answers
1. 12 – 6 ÷ 2 + 1
n200080 [17]
1. 10           division comes first :)
2. 3        division comes first :)

3. 29            division, then multiplication comes first :)
4. 32         8 x 4 :)

5. $5.00        $10.00 - $5.00 :)

6.  870            48 x 8, then 54 x 9 :)
Glad I could help, and good luck :)

7 0
3 years ago
Read 2 more answers
Anne is choosing a contractor. She has narrowed down her selection to two companies and will base her decision on the likelihood
FinnZ [79.3K]

Answer: Option A.

Step-by-step explanation:

The joint probability for two different things is equal to the product of the individual probabilities.

For contractor A we have:

Prob that the job is done in time  = 0.95

Prob that the job is done within the budget = 0.97

Prob of both things at the same time P = 0.95*0.97 = 0.92

For company B we have:

Prob that the job is done in time  = 0.98

Prob that the job is done within the budget = 0.93

Prob of both things at the same time P = 0.98*0.93 = 0.91

Then the best contractor is contractor A, (with a joint probability of p = 0.92) and the correct option is option A.

6 0
4 years ago
Other questions:
  • Which property explains why these two expressions are equal?
    5·1 answer
  • Identify the values of the variables. Give your answers in simplest radical form. PLEASE HELP!!
    5·1 answer
  • I need help with this exercise please. What I need to know is the measure of one side of the square. Sorry for the language of t
    5·1 answer
  • The Rodriguez family went to dinner at Pasta Palace. Mr. Rodriguez ordered a meal for $6.25; Mrs. R ordered a meal for $7.50; th
    5·1 answer
  • In a study of 225 adults, the average heart rate was 72 beats per minute. Assume the population of heart rates is known to be ap
    12·2 answers
  • A.)Write a mixed number.
    10·1 answer
  • 1 foot = 12 inches
    5·2 answers
  • FREEEEE plz sub to my yt it called chrisgamez it the one with like 27-30 subs ty
    15·2 answers
  • Convert 6¼ % into decimal<br>​
    11·2 answers
  • Luke sold 4 times as many books as Maurice. If Maurice had sold 18 more books, he would have tied Luke for first place. How many
    13·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!