Answer: make a distinction between small and large spills—this is a judgment call based ... Several of the regulatory reporting thresholds are given in pounds, such as the ... for the chemical composition and hazard information (see Chapter 12, Routine ... or two spills each greater than 42 gallons occur within 1 year (40 CFr 112.4).
Explanation:
Explanation:
Technology that is made use of in the classroom is very beneficial in helping the students understand and absorb what they are being taught. ... Students make use of computers to come up with presentations and also make use of the internet to carry out research on a variety of topics for their essays and papers.
9514 1404 393
Answer:
ditch digger
Explanation:
Just as a "sanitation engineer" is a name given to a garbage collector, so "soil relocation engineer" may be another name for a ditch digger or grave digger.
__
There are many jobs in the mining and construction industries where engineering expertise is required with respect to appropriate relocation of soil. A <em>mining engineer</em> will need to relocate soil in such a way as to prevent cave-ins, slides, or pollution, while facilitating reclamation of the mine site when it is no longer productive.
A <em>civil engineer</em> will need to relocate soil using many of the same considerations as a mining engineer, but will also have to plan the moves so as to minimize cuts and fills, and to ensure adequate compaction for the construction to be done.
A <em>dredge operator</em> will perform soil relocation operations to or from underwater locations.
Explanation:
C because detail really gets you imagining and painting the picture in your mind