Answer:
1 is c and i cant see all the options for 2
Answer:
change in neither size nor shape
Answer:
$10.00 per hour
Step-by-step explanation:
Overhead application rate which is also known as overhead absorption rate on the basis on labor hours is the total budgeted overhead for 2019 which is $900,000 divided by the expected production of 90,000 labor hours for the year.
overhead application rate=$900,000/90,000=$10 per hour
This implies that for every one hour worked overhead cost of $10 would be added to the other costs incurred.
The correct option then is the third option of $10.00 per hour
Answer:
Length = 16 inches and width = 12inches
Step-by-step explanation:
A = 192 in² . The width is 4 + 1/2x. therefore let x = length
Area = LW
192 = x(4 + 1/2 x)
192 = 4x + 1/2x²
384 = 8x + x² Multiply each term by 2 to make a
384 + 16 = x² + 8x + 16 Complete the square
400 = (x + 4)²

± 20 = x + 4
20 = x + 4 or -20 = x + 4
20 - 4 = x or -20 - 4 = x
16 = x or -24 = x reject the negative amount
Length = 16
width = 4 + 1/2(16); 4 + 8 = 12
Answer:
the pic shows the coordinates