In certain games, one player or company will act first and commit to a plan that the other player or company would then counter. Sequential games are such games.
Sequential games are ones in which each player makes a move in turn or at a distinct moment. This implies that players that move later in the game have more knowledge about other players' or the world's states' activities. This implies that first-moving players frequently have an impact on the game.
Sequential games include chess, endless chess, backgammon, tic-tac-toe, and Go, among others.
According to sequential game theory, one player has an advantage over the others by moving first. In this approach, the game's flow is decided by the first mover.
To learn more about Sequential games
brainly.com/question/14102931
#SPJ4
<span>In order to assess who is correct the exact nature of the tire needs to be seen in more detail. If the tire has been damaged by driving, a crash or some other method, than Technician B would be correct because the tire would need to repaired. However, if tires is moving funny as a result of a bump or some other impact to it, then it could be that the weights have become mis-aligned and then Technician A would be correct in that re-balancing solves the problem.</span>
<span>Advertisers can determine how effective their media mix has been in reaching their target audience by calculating the total GRP of the advertising schedule.In advertising, a gross rating point (GRP) is a measure of the size of an advertising campaign by a specific medium or schedule.</span>
Answer:
14,000 units
Explanation:
By the use of the cost volume analysis concept, the break-even point is obtained by dividing fixed costs by contribution margin per unit.
in this case,
fixed costs are $98,000
contribution margin per unit??
CM per unit = selling cost per unit - variable cost per unit
=$12- $5
contribution margin = $7 per unit
break-even point= $98,000/ $7
break -even = 14,000 units
Given the Ricwy corporation maintenance cost is modeled by the formula y=4800+0.4x, the maintenance cost when x=9000 hours will be:
y=4800+0.4(9000)
y=4800+3600
y=$8400
The total maintenance cost for the month of August will be $8400