Answer:
21 weeks
Step-by-step explanation:
In this question, we are to use proportionality to find the solution to the question.
We were made to know that the time taken to build the highway is varied directly with the length and inversely with the number of workers.
Let us make a mathematical representation for this.
Let the time be t, number of workers be w and length be l
t is directly proportional to l and inversely proportional to w
Mathematically;
t = kl/w
Where k is the constant of proportionality.
Let’s find the value of k
150 workers built 12 miles of highway in 14 weeks ; plug these in the equation to get k
14 = k * 12/150
k = 150 * 14/12 = 175
Now we want to get t given w and l
from ;
t = kl/w
We can get t; where l = 15 and w = 125
t = 175 * 15/125
t = 21 weeks
Answer:
What happened frnd?
plz answer me!
have a great and pleasant day ahead
The picture in the attached figure
we know that
perimeter of a rectangle=2*[base+height]
base=3y+1
height=2y+3
perimeter=90 units
so
90=2*[(3y+1)+(2y+3)]-----> 90=2*[5y+4]----> 10y+8=90----> y=8.2 units
base=3y+1-----> base=3*8.2+1-----> 25.6 units
height=2y+3----> height= 2*8.2+3---> 19.4 units
the answer is<span>
the length of side vy is (2y+3)-----> 19.4 units</span>
Answer:
(-5,1)
Step-by-step explanation:
Calculate for the mean/ average of the given numbers:
μ = (1 + 2 + 3 + 4 + 5) / 5 = 3
Then, we calculate for the summation of the squares of differences of these numbers from the mean, S
S = (1 - 3)² + (2 - 3)² + (3 - 3)² + (4 - 3)² + (5 - 3)²
S = 10
Divide this summation by the number of items and take the square root of the result to get the standard deviation.
SD = sqrt (10 / 5) = sqrt 2
SD = 1.41
Thus, the standard deviation of the given is equal to 1.41.