In this question we know what the “y-intercept is,so if we go to our graph we can easily just plot the point 7.6 on the y axis of a number line. It also gives you the slope in decimal form so we would want to convert that from 0.2 to 1/5. And remember the slope is how many places you move to get to the next point on the number line. So from the point 7.6 we would move up 1 over 5 to the right because it is a positive number. Your line should run across the upper segment of the number line and your line should make a 20 to 30 degree angle shift
Answer:
542 minutes
Step-by-step explanation:
currently our mean is =530
i got that by adding all the number out which equal too =2,650
and divide it by how many number there are which is 5
2,650/5=530
After some trial and error i found it
so you add 494+690+502+478+486+542=3,192
3,192/6=532
and that was our goal
so the 6th month she talked on the phone for 542 minutes
pls mark me brainliest
Answer:
The minimum sample size needed is 125.
Step-by-step explanation:
In a sample with a number n of people surveyed with a probability of a success of
, and a confidence level of
, we have the following confidence interval of proportions.

In which
z is the zscore that has a pvalue of
.
The margin of error is:

For this problem, we have that:

99% confidence level
So
, z is the value of Z that has a pvalue of
, so
.
What minimum sample size would be necessary in order ensure a margin of error of 10 percentage points (or less) if they use the prior estimate that 25 percent of the pick-axes are in need of repair?
This minimum sample size is n.
n is found when 
So






Rounding up
The minimum sample size needed is 125.
The answer is option 2,
2x10^10
They’re both perpendicular, I used a graphing calculator to get the interpret answer