Answer:
First question: LCL = 522, UCL = 1000.5
Second question: A sample size no smaller than 418 is needed.
Step-by-step explanation:
First question:
Lower bound:
0.36 of 1450. So
0.36*1450 = 522
Upper bound:
0.69 of 1450. So
0.69*1450 = 1000.5
LCL = 522, UCL = 1000.5
Second question:
In a sample with a number n of people surveyed with a probability of a success of
, and a confidence level of
, we have the following confidence interval of proportions.

In which
z is the zscore that has a pvalue of
.
The margin of error is:

The project manager believes that p will turn out to be approximately 0.11.
This means that 
95% confidence level
So
, z is the value of Z that has a pvalue of
, so
.
The project manager wants to estimate the proportion to within 0.03
This means that the sample size needed is given by n, and n is found when M = 0.03. So






Rounding up
A sample size no smaller than 418 is needed.
To find out how much Stan is paid a day, simply find out how many miles Stan drives per day, and multiply that with the amount Stan is paid per mile (in this case $3.50 per mile). Then, add that with the daily amount Stan earned (which is $75).
For example, on Monday, Stan drove a total of 30 miles (and he's paid $3.50 per mile).
Simply multiply $3.50 (per mile) with 30 (total number of miles driven), and that should equate to $105 earned for driving a total of 30 miles.
Then, add $105 (earned from driving 30 miles) to $75 (daily pay) and that equals $180.
Stan had been paid a total of $180 on Monday.
Answer:
Instead, you use the symbol to indicate “approximately equal to.” The circumference is 9 or approximately 28.26 inches.
Problem: Find the radius of the circle
Answer: The radius is 18 feet
Step-by-step explanation:
Answer:
Slope=− 2.0000.500=−0.250
m−intercept= 1/9 =9.00000
n−intercept= 4/9 =2.25000
Step-by-step explanation: