Answer:
<h2>

</h2>
Step-by-step explanation:




Answer:
Use this Formula m= y2 - y1 / x2-x2
Than find rise and run and graph it
Step-by-step explanation:
The equation of the vertical line that satisfies the condition is x=0.
Answer:
95.64% probability that pledges are received within 40 days
Step-by-step explanation:
Problems of normally distributed samples are solved using the z-score formula.
In a set with mean
and standard deviation
, the zscore of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.
In this problem, we have that:

What is the probability that pledges are received within 40 days
This is the pvalue of Z when X = 40. So



has a pvalue of 0.9564
95.64% probability that pledges are received within 40 days
Answer:
The length of A will be 8 as
The ratio between the sides are 4:1
Since Side is 2 therefore side A=2*4
=8
Hope u got your answer..