1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Vika [28.1K]
3 years ago
6

What values do you need to know to create a box plot? Select all that apply interquartile range

Mathematics
1 answer:
Eva8 [605]3 years ago
4 0

Answer:

B., C., and E or 2, 3, and 5

Step-by-step explanation:

I did it and got it right.

You might be interested in
Solve for z<br> answer correctly
Lorico [155]
Z=1 eventually you get 15 divided by 15 giving you Z=1 it’s a long equation
5 0
2 years ago
Read 2 more answers
Help with the question above! Pleaseeeeee!
SSSSS [86.1K]
Question 5:
 the circumference is given by:
 C = 2 * pi * r
 Where,
 r: radio of the ball
 Substituting values we have:
 22 = 2 * pi * r
 Clearing r we have:
 r = 11 / pi
 The surface area is given by:
 A = 4 * pi * r ^ 2
 Substituting values we have:
 A = 4 * 3.14 * (11 / 3.14) ^ 2
 A = 154 in ^ 2
 Answer:
 
The surface area of the balloon is:
 
A = 154 in ^ 2

 Question 8:
 For this case we have that the scale factor is given by:
 V1 = (k ^ 3) * V2
 Substituting values we have:
 729 = (k ^ 3) * 2744
 Clearing k:
 k = (729/2744) ^ (1/3)
 k = 9/14
 Answer:
 the scale factor of a cube with volume 729 m ^ 3 to a cube with volume 2,744 m ^ 3 is:
 9:14

 Question 2:
 The volume of the cylinder is given by:
 V = pi * r ^ 2 * h
 Where,
 r : radio
 h: height
 Substituting values:
 V = pi * (2.8) ^ 2 * (13)
 V = 101.92 * pi
 Answer:
 
The volume of the cylinder is:
 
V = 101.92 * pi
 
option 3
4 0
3 years ago
Read 2 more answers
george completed 3/5th of work in 9 days with the help of paul he completes remaining work in 4 days.In how many days paul alone
IRINA_888 [86]
If George completed 3/5 of work in 9 days, it means that he needs 3 days to finish 1/5th of the work.

The remaining part is 2/5 because 1-3/5=2/5. 2/5 is also 6/15

From this, how much did George do? in the first 3 days he did 1/5th and then one more day was left, during which he did 1/5/3=1/15th.

So he did in total 1/15+1/5=1/15+3/15=4/15.
this means that Paul did the rest of 6/15, so Paul did 6/15-4/15=2/15.

So we know that he does 2/15 in 4 days, which means that every two days he can do 1/15 of the work

so he would need 15 times 2 days to finish the work - 30 days!
6 0
3 years ago
This graph shows fuel consumption for a car during a test run. Three of the statements are true. Which is NOT?
diamong [38]

The answer I got was C = The car used 70 gallons of gas to go 3 miles.

Hope this helps.

6 0
3 years ago
The last question for my test help
alisha [4.7K]

3 2/6

5/6*4=20/6

20/6= 3 2/6 OR 3 1/3

8 0
2 years ago
Other questions:
  • Line L passes through the points (1, 5) and (5, 8). What is the slope of a line that is perpendicular to line L?
    6·1 answer
  • A car travels about 78 feet in one second At this speed about how many feet will the car travel in 5 seconds
    15·1 answer
  • I need help determine the domain and range pls
    14·1 answer
  • 1/4 subtract by 1 1/2
    8·2 answers
  • FACTORISE 16x^2-y^2+4yz-4z^2​
    15·1 answer
  • Perform the indicated operation and simplify the result. Leave your answer in factored form.
    10·1 answer
  • Factor 30-20 using gcf
    13·2 answers
  • Which system matches the graph below?
    12·1 answer
  • Need help with this i don't understand
    15·1 answer
  • If 9: x= x4, then x=
    15·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!