
===========================================
<u>Solution - Answer (a): The current maximum output would depend on slowest operations and that is B. Optometrist conducting eye exam (25min per patient) Hence total time available for task(B)= 10 hours * 60 min - (2 minute for first patient to greet + frame selection 20 min + glasses made 60 min + final fitting 5 min) = 600 -87 = 513 minutes. Hence, maximum capacity = 513/25 = 20.52 ~ 20 patients Answer (b): Since, the slowest process is B. Optometrist conducting eye test, if a person were to be added it must be there. The added capacity at no other place would increase total capacity of the patients processed in a day. Answer (c): In the mentioned model, the process of D and E, totaling to 65 minutes would be eliminated. And hence, in day...</u>
<u>tsurezure children</u>
<u>#BrainliestBunch</u><u> </u>
Answer:
1. the primary mechanism to maintain homeostasis is negative feedback.
2. When exposed to hot conditions, sweating is one of the primary methods your body uses to control its temperature.
3. Sweat, as it evaporates, helps cool the skin. Blood vessels feeding the skin also dilate, which allows warm blood to flow to the skin surface. This helps remove heat from the body core.
4. Bacteria can also disrupt homeostasis in your body, and can make you sick.
5. In response to infection, your immune system springs into action.
6.
In North America, the demand for ampetamine (especially methamphetamine) has been stable
Answer:
What is the universe made of? Astronomers face an embarrassing conundrum: they don't know what 95% of the universe is made of.
Explanation: