1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Ierofanga [76]
3 years ago
10

PLEASE DON'T IGNORE!

Mathematics
1 answer:
Debora [2.8K]3 years ago
8 0
Answer is b hope this helps
You might be interested in
What is the value expression to 3 1/4 - 1 7/8 =show how?
Andrei [34K]
3 1/4 - 1 7/8
First, subtract the whole numbers (3 - 1 = 2):           
= 2 1/4 - 7/8
Convert 1/4 to 2/8:
= 2 2/8 - 7/8
Borrow 1=8/8 from the 2:
= 1 10/8 - 7/8
Subtract 7/8 from 10/8:
= 1 3/8

The answer is 1 3/8

Alternatively, use improper fractions:
3 1/4 = 13/4 = 26/8
1 7/8 = 15/8
26/8 - 15/8 = 11/8 = 1 3/8
3 0
3 years ago
Please help asap !
quester [9]

Answer:

Step-by-step explanation:

4 0
3 years ago
The game. Their scores are shoun below.
Harrizon [31]

Answer:

Barb is correct she won by 10 points

Darius's=480

Barb=490

5 0
3 years ago
Isaiah brought two dozen donuts to a class party. Half of the donuts had vanilla frosting with sprinkles, 2 had strawberry frost
enot [183]

Answer:

22/24

ALL TOGETHER there is 24 donuts.

take half of 24, or 24 divided by 2, and you get 12.

so we know 12 of the donuts are vanilla with sprinkles.

then 2 had strawberry frosting and the rest had chocolate and sprinkles.

we took 12 away so we only have twelve left and if 2 of those 12 are strawberry with no sprinkles and the rest are chocolate WITH sprinkles, this means 10 are chocolate with sprinkles.

so 10 chocolate and sprinkles +12 vanilla and sprinkles=22 donuts with sprinkles out of 24 donuts total

7 0
3 years ago
200 labourers need 50 days to construct a road of 4 km long. How many labourers are needed to construct 8 km long in 80 days​
patriot [66]

Answer:

250

Step-by-step explanation:

Number of labourers * Number of days worked = Total number of working days

Total number of working days to construct a 4km long road: 200*50=10000

Total mumber of working days to construct a 8km long road: 10000*2=20000

Labourers: 20000 ÷ 80 = 250.

250 labourers are required.

7 0
3 years ago
Other questions:
  • What is the slope of the horizontal line
    10·1 answer
  • Convert 64°F to °C (to the nearest tenth) using one of the following formulas: Fahrenheit to Celsius Celsius to Fahrenheit °C =
    5·2 answers
  • Which of the following is the graph of f(x) = x2 + 3x − 4? graph of a quadratic function with a minimum at 2, negative 9 and x i
    7·2 answers
  • H(n) = n + 3<br> g(n) = 3n<br> Find (h + g)(n)
    11·1 answer
  • Simplify, using the distributive property and then combining like terms. 4(2x+y)-3(x+y)
    15·2 answers
  • Shayna sold 6 French silk cheesecakes and 6
    14·1 answer
  • Two candidates run for class president. After all the ballots are counted, one candidate has 50% of the votes. What decimal name
    6·2 answers
  • Which of the following is true?
    14·2 answers
  • A student bikes 1/4 miles to school. After school, the student bikes 1/3 miles to a cousin’s house. Finally, the student bikes 7
    14·1 answer
  • Find the x- and y-intercepts for the following equation. Then use the intercepts to graph the equation.
    10·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!