-5.9, -4.6, -1/4, 1/2, 1.75, 2, 18, 21.
You first convert everything to minutes
3hrs= 60x3=180mins
1hr= 60x1=60mins
then you add 20 to 180
200
and you also add 48 to 60
104
200-104=
96
Then you convert to hrs and mins
96-60=36
1hr 36mins
The correct answer would be 61.32
Answer:
x = 2√2
Step-by-step explanation:
This is a 45-45-90 triangle. This means that if the legs are x, then the hypotenuse is x√2.
In the case, the hypotenuse is already 4. So we have the equation:
x√2 = 4
Multiply both sides by √2
2x = 4√2
Divide both sides by 2
x = 2√2
Construction.
When construction workers need measurements that are fractions they need to be able to multiply/add/subtract/divide all of those different fractions and mixed numbers.
I hope I was able to help. Best of luck.