Answer:
The time required to finish the work by both candy and Tim working together = 36.83 minute
Step-by-step explanation:
Time taken by the candy to finish the work
= 85 min
Time taken by the Tim to finish the work
= 65 min
Thus the time taken by both to finish the work = 
Put the values of
and
we get ,
= 
= 
= 36.83 minute
Thus the time required to finish the work by both candy and Tim working together = 36.83 minute
Answer: Option D
Step-by-step explanation:
Soup : 15/5 is 3 x 7 is 21
Peanut: 35/7 is 5 x 5 is 25
Answer:
120 minutes
Step-by-step explanation:
the total bill was $58 so we have to subtract the $40 monthly bill part to find how much extra money she paid because her call was over 200 minutes
58-40=18
Then divide the $18 by $0.15 since the $18 is the total amount of each time she was charged $0.15 for going 1 minute over 200 minutes
18÷0.15 = 120
120 is te Amount Of minutes she went over her 200 minute limit
The midpoint of the line having the endpoints

and

is

basically average them
so given that the line has the endpoints of (-3,7) and (9,-2)
x₁=-3
y₁=7
x₂=9
y₂=-2
so the midpoint can be found by doing



the midpoint is
Conversion.
1 yard = 3 feet
So the fabric has 2 yards. Then the size of the patch is 1/4 foot.
So the number of patches that Marcus used is..
= 3 * 2
= 6 / (1/4)
= 24 patches.
So a total of 24 patches Marcus used.