Answer:
Step-by-step explanation:
i think its C sorry if its wrong
Answer:
b. 0.12
Step-by-step explanation:
Problems of normally distributed samples are solved using the z-score formula.
In a set with mean
and standard deviation
, the zscore of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.
In this problem, we have that:

What is the probability that a seed will take more than 720 hours before germinating?
This is 1 subtracted by the pvalue of Z when X = 720. So



has a pvalue of 0.88.
1 - 0.88 = 0.12
So the correct answer is:
b. 0.12
Answer:
3,-3) becomes ; (3 + 5 , -3-12) ; (8,-15)
(7,-10) becomes;( 7 + 5, -10-12) ; (12,-22)
(13,-14) becomes (7 + 13, -14-10) ; (20,-24)
Step-by-step explanation:
What we have to do here is to add 5 to the x-axis value and subtract 12 from the y-axis value
(3,-3) becomes ; (3 + 5 , -3-12) ; (8,-15)
(7,-10) becomes;( 7 + 5, -10-12) ; (12,-22)
(13,-14) becomes (7 + 13, -14-10) ; (20,-24)
Answer:
Linear binomial
Step-by-step explanation:
First, distribute the 2 to each term in the first trinomial:
To add polynomials, remove the parentheses and combine like terms:
The resulting polynomial has a degree of 1 and two terms. So, it is a linear binomial.