Answer: 45 containers
Explanation:
The number of containers needed is calculated by:
= (Expected demand during Lead time + Safety Stock) / Container Capacity
Expected demand during Lead time = Daily demand * Lead time
= 2,500 * 3
= 7,500 units
Safety stock = 1.5 days * 2,500
= 3,750 units
Number of containers needed:
= (7,500 + 3,750) / 250
= 45 containers
Answer:
Option (C) is correct.
Explanation:
Variable costs = $28
Allocated fixed costs = $17
Selling price = $84
Due to acceptance of M offer, S would be got excess contribution margin per unit. Because acceptance selling price ($34) is greater than the variable cost per unit ($28).
We don't have any information about the fixed cost due to acceptance. Therefore, we assumed that fixed cost is not increased.
Increased contribution margin per unit:
= Selling price - Variable cost
= $34 - $28
= $6
For 3,000 units, Increased contribution margin = 3,000 × $6
= $18,000
Therefore, net income is increased by $18,000 when the offer is accepted.
Set specific, challenging, and reachable goals for the team. In addition, goal setting is the procedure of classifying to some degree that a team want to achieve and founding quantifiable goals and timeframes. When the team decide on a technique change to win the game in which this is an example of goal setting.
Answer:
$7.05
Explanation:
Given that
Direct labor = $3.50 per unit
Direct material = $1.25 per unit
Variable overhead = $41,400
Total fixed overhead = $150,000
Produced units = 18,000
The computation of total product cost per unit under variable costing is shown below:-
Total Variable overhead = Variable overhead ÷ Produced units
= $41,400 ÷ $18,000
= $2.3
Total product cost per unit = Direct labor + Direct material + Total variable overhead
= $3.50 + $1.25 + $2.3
= $7.05