Answer: hello your question has some missing information below is the missing information
Suppose the economy begins with output equal to its natural level. Then there is an increase in consumer confidence and households attempt to consume more for a given level of disposable income.
answer :
Attached below
Explanation:
IS-LM modeling curves intersects and it also defines the value of r and Y where r ( rate of interest ) Y( output level )
The AS-AD modeling is in equilibrium where aggregate demand curve and short run and long run aggregate supply curves intersects each other defining P and Y
p ( price level ) , Y ( output level )
<em>Note : Increase in aggregate demand shifts IS outward , raises interest rate and output level</em>
Having an established plan reduces the confusion that sometimes occurs with an accident. ... As part of the pre-accident planning, assign specific roles or duties to key personnel. These employees control specific aspects of the accident response to keep a handle on the situation. In short form, it is t<span>o establish procedures which result in preventing </span>accidents<span>.</span>
Answer:
Predetermined manufacturing overhead rate= $42 per direct labor hour
Explanation:
Giving the following information:
Estimated manufacturing overhead= $924,000
Estimated direct labor hours= 22,000
To calculate the predetermined manufacturing overhead rate we need to use the following formula:
Predetermined manufacturing overhead rate= total estimated overhead costs for the period/ total amount of allocation base
Predetermined manufacturing overhead rate= 924,000/22,000
Predetermined manufacturing overhead rate= $42 per direct labor hour
B. False, the employer is looking to hire the people with the most eye catching and outstanding application, if you have an application in that doesn't have all the information on it or forgetting to capitalize your name could make them pass right over your application and go back to it if they have any open spots.