Answer:
the allocated direct manufacturing overhead costs of Job 56 is $25
Explanation:
Overheads in manufacturing process are allocated to jobs or products using cost drivers or surrogates.
<em><u>First Step : Determine the Pre-determined Overhead rate</u></em>
Pre-determined Overhead rate = Budgeted Overheads / Budgeted Activity
= $2,000 / 800
= $ 2.50 per labor hour
<em><u>Step 2 : Determined the Amount of Overhead allocated to Job 56 based on labor hours utilised</u></em>
Overhead for Job 56 = Pre-determined Overhead rate × Hours Used
= $ 2.50 × 10
= $25
Answer:
$25,000
Explanation:
Data provided in the question
First payment will occur in a year = $1,000
Growing rate = 8%
Interest rate = 12%
So, the today value of the bequest is
= (First payment will occur in a year) ÷ (Interest rate - growing rate)
= ($1,000) ÷ (12% - 8%)
= ($1,000) ÷ (4%)
= $25,000
Hence, the today value of the bequest is $25,000
Answer:
Consumer surplus decreases by $180.
Explanation:
Current consumer surplus = $25 * 90 unit = $2250
If the price of goods drop to $23 then the new consumer surplus will be
$23 * 90 units = $2070
The change in consumer surplus is $180 .
A cost with the characteristics of both a variable cost and a fixed cost is called <u>d. mixed cost.</u>
<h3>What is a mixed cost?</h3>
A mixed cost is a cost consisting of a mixture of fixed and variable elements.
For a mixed cost, the costs are fixed at a certain level of output or consumption and then become variable after this level.
Thus, a cost with the characteristics of both a variable cost and a fixed cost is called <u>d. mixed cost.</u>
<u></u>
Learn more about mixed costs at brainly.com/question/8225307
Answer:
The flexible budget for sales = $195,000
Explanation:
<em>A flexible budget is that which is prepared for actual level of activity achieved. It is used for control purpose to determine how where the a business is doing in terms of performance .</em>
The flexible budgeted is usually prepared at the end of the period to which it relates. In other words, it is prepared in retrospect. And it uses the assumptions of the fixed budget.
The flexible budget for sales = actual sales in units × Standard selling price
= 15,000× $13.00 = $195,000
The flexible budget for sales = $195,000