Answer:

Step-by-step explanation:
Check the attached photo for the details
2
Hope I helped!
Let me know if you need anything else!
<span>~ Zoe (Rank:'Genius')</span>
The answer is 7x = 6(x + 15)
x - Jim's rate
y - Pete's rate
<span>Jim completed half the floor in 7 hours: 7x = half of the floor
</span><span>Pete completed the other half of the floor in 6 hours: 6y = half of the floor
So: 7x = 6y
</span><span>Pete can lay 15 more tiles per hour than Jim: y = x + 15
</span>7x = 6y
y = x + 15
Substitute the second equation into the first one:
7x = 6(x + 15)
346 divided by 2 would be 153. Subtract 92, and that would lead you with 61.
Therefore, the ultimate answer is 61.