The correct answer to this open question is the following.
Although there are no options attached we can say the following.
Do earthquakes ever happen in Malaysia?
Yes, they do. And they are very frequent and high in intensity.
For instance, the Sabah earthquake in 2015.
On June 5, 2015, the region of Malaysia was hit by a strong earthquake, 6.0 of magnitude on the Ritcher scale. The telluric movement lasted 30 seconds and caused much destruction.
Experts and scientists confirm that this had been the strongest earthquake since the one presented in 1976.
Answer:
1. B 2. D
Explanation:
If computers share processing power, it is just a larger computer.
Answer:
Charles Babbage
Explanation:
Analytical engines were presumed to be the first general-purpose computer which was designed sometime in the 19th century by Charles Babbage - a British mathematician and inventor. A series of punch cards was used by Charles Babbage in his design of the engine. These punch cards were used for various operations such as arithmetical operations, numerical constants and other operations such as load and store.
<em>Hope this works!</em>
Answer: URN(Uniform Resource Name) is the basically a subset of the Uniform Resource identifier(URL). It uses "urn"scheme for the working an implementation. Uniform resource name functions by identifying components uniquely through their name.
The most common example of URN is ISBN (International Standard Book Number)number which helps in the unique searching and identification of book.
The answer is the team. Teams are self-establishing which no one not even the scrum master tells the team how to turn product backlog into augmentations of stoppable functionality. Each team member put on his or her knowledge to all of the complications. The interaction that outcomes progresses the entire scrum team’s general competence and usefulness. The optimal size for a scrum team is seven people, plus or minus two. When there are fewer than five team members, there is less interface and as a result less productivity improvement. The product owner and scrum master roles are not comprised in this count. Team arrangement may variation at the end of a sprint. Every time Team membership is altered, the productivity increased from self-organization is reduced.