Answer: true
Explanation: yes water is constantly in motion
Answer:
Please check the attachment.
Explanation:
avg turnaround time = (38+7+42+33+18)/5= 27.6
avg waiting timee = (33+5+28+23+17)/5= 21.2
And its D, A C in Gantt chart at last and exit time are 33, 38 and 42 mentioned as last three in Gantt chart.
A) your temp gauge is moving into red
Answer:
several personnel accessing the registration system
Explanation:
batch processing is all about multiprogramming so I think the first answer is the best as it is not based on one person .I know the last answer might be almost close but on a closer look it is not the answer as it is single based as written a file
Answer:
Natural systems are already in place while man made systems were created by humans manipulating things in some way.
Explanation:
man made: human created
natural systems: existed without interference