B can finish the job alone in 24 days.
In work-rate problems, a certain person can complete a fraction of the job for a specific timeframe. As stated in the problem, A and B can finish the job by working together for 8 days. It must be noted that the fraction of the job they can finish individually per day is additive.

A can complete the work in 12 days and finish 1/12 fraction of a job per day. This can be substituted directly to the equation to solve for the time B needed to finish the work.



This means that B can do 1/24 fraction of the job per day and can completely finish the job in 24 days.
For more rate work-rate problems, please refer to the link brainly.com/question/14464103.
#SPJ4
For number 19:
"at least 150" means either 150 ≤ ? or ? ≥ 150
plus 3 so +3x
The answer would be 150 ≤ 100 + 3x
Number 20:
A is at -2.5. The inverse is the opposite so 2.5
Area of the triangle: 1/2 x 6 x 8 = 24 square ft.
Area of half circle: 1/2 x 3.14 x 4^2 = 25.12 square feet.
Total area : 24 + 25.12 = 49.12 square feet.
So u have 5 fruits and 3 bowls
Divide 5 into 3 that would equal how many grams you would put in one bowl then measure that and then complete it by adding that amount into each bowl