1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Lubov Fominskaja [6]
3 years ago
5

What will the finance charge be on Hannah's computer purchase? (Do not include sales tax)

Mathematics
1 answer:
k0ka [10]3 years ago
8 0

Answer:

She would be paying $2,622 total.

Step-by-step explanation:

1. To get how much she'd be paying for 24 months, all you have to do is multiply 24 times 95.

2. To get the down payment you had to ask yourself what's 15% of 2,280. 15% of 2280 is 342.

3. Add those together and you'd get the total payment.

Simple.

Oh and gimme Brainliest if it's correct.

You might be interested in
Sovle the inequality r - 7 ≤ 2​
yawa3891 [41]

Answer:

r≤9

Step-by-step explanation:

8 0
3 years ago
Read 2 more answers
2.<br> A line goes through the points (0, 10) and (-1, 1).<br> 2a<br> What is the slope of the line?
sashaice [31]

Answer:

9

Step-by-step explanation:

We can find the slope using the slope formula

m = ( y2-y1)/(x2-x1)

    = ( 1 -10)/(-1 -0)

   = -9/-1

   = 9

6 0
3 years ago
Read 2 more answers
In constructing a box-and-whisker plot from a data set, which values are at the ends of the box?
I am Lyosha [343]

Answer:  In constructing a box-and-whisker plot from a data set,  the minimum and maximum values are at the ends of the box.


Step-by-step explanation:

A box and whisker plot displays the five measures of data. The five measures summary is the minimum, first quartile, median, third quartile, and maximum. In a box plot, we draw a box from the first quartile to the third quartile.

Therefore, In constructing a box-and-whisker plot from a data set,  the minimum and maximum values are at the ends of the box.

Hence, A is the right option,

8 0
3 years ago
Prove that the sum of two odd numbers is an even number
Maru [420]
Let a and b be odd number.
Because they are odd, by definition:
a = 2n + 1 
b = 2m + 1
If we add them up:
a + b = 2n + 1 + 2m + 1
         = 2n + 2m + 2
         = 2(n + m + 2)
         = 2k where k = n + m + 2

therefore a + b is always even.

5 0
3 years ago
the two rectangular plots of land have properties side lengths what is the perimeter of the smaller rectangle A. 28 B. 32 C. 36
grandymaker [24]

Answer:

I think that it would be b 32

3 0
3 years ago
Other questions:
  • Is 43/10 an irrational number or rational number ?
    11·1 answer
  • Solve the following exponential growth function for y when x=5. round to the nearest tenth
    12·1 answer
  • There are 768 beds in a hospital, each floor has 64beds, how many floors are there
    13·1 answer
  • Rewrite with only sin x and cos x.
    14·1 answer
  • The width of a rectangle is 3 less than twice the length ,x. if the area of the rectangle is 43 square feet,
    7·1 answer
  • Does anyone know how to convert meters per second into miles per hour? if possible, plz post the exact equation
    13·1 answer
  • Math please help!!!!
    12·1 answer
  • Why did the long expression that had just gotten out of the hospital move more slowly that the short expression?
    6·1 answer
  • Using the figure below, find the value of b. Enter your answer as a simplified radical or improper fraction (if necessary) into
    7·1 answer
  • Can 10 people be divided into two groups with a ratio of 1 : 2? Explain.
    14·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!