Answer:
11. It will take about 26 minutes to install a singular tile.
12. It will take about 10 more minutes to install a light than it does to install a cable.
Step-by-step explanation:
11. Since installing 15 new tiles took a total of 390 minutes and each tile took the same amount of time, you can divide the total amount of time by the number of tiles.
390/15= 26 minutes
It will take about 26 minutes to install a single tile.
12. By looking at the chart it can be assumed that installing a light takes about 22 minutes since it is in the middle of 20 and 24 minutes. Installing a cable only takes 12 minutes.
22-12= 10 minutes
It takes about 10 minutes longer to install a light than it does a cable.
Step-by-step explanation:
-9 x s = 6
-9 x 6 =s
-54=s
s=-54
Answer:
In this problem it gives you the equation you need to solve it.
Y=10x+190
The question asks for the number of calories if the snack has 35 grams of fat. The grams of fat is the independent variable so it is going to be x. So just substitute the x in the equation with 35.
Y=10×35+190
Y=350+190
Y= 540
So for a snack that has 35 grams of fat, it would have 540 calories.
Question:
A sample of cans of peaches was taken from a warehouse, and the content of each can mearsed for weight. the sample means was 486g with stand deviation 6g. state the weight percentage of cans with weight:
Draw normal curve to help - split into 8 section ( i can't draw it here)
a) 34.13% of cans will be between 480g and 486g.
b) 13.59 + 2.15 + 0.13= 15.87% of cans greater than 492g.
Look at the Stand Dev Graph where the give you the number
Step-by-step explanation:
Let me give you a different question and i will answer it, which you help you answer your question.
Answer:
50%
Step-by-step explanation:
Since there is either heads or tails, meaning only two options you have a 50% chance of getting heads