From the beginning we know we are dealing with two different rates. Distance is equal to (Speed X Time). We have two different speeds though. We will call the min speed = x and the max speed = y. With those two ideas in place we can make two equations for both Tony and Rae.
Tony:
2x+3.5y=355
Rae:
2x+3y=320
Now you can solve the equations by subtracting Rae's equation from Tony's
.5y=35 solve for y and you get 70
Now plug that y value back into either equation and you can solve for x. I'll use Rae's distance:
2x+3(70)=320
x=55
Answer:
$3.30 ($3.289)
Step-by-step explanation:
2.3 times 1.43 = 3.289 rounded to 3.30
R - Right Handed
L - Left Handed
R = 9L ( the number of right handed kids is equal to having 9*number of left handed kids)
9L + L = 30 ( since total number of people in class is 30)
10L = 30
( Divide by 10 both sides )
L = 3
so... There are 3 Left Handed kids and 27 Right Handed kids ( since R = 9L , R = 9(3) = 27)
Hope this helped!
There are 440 thousands :)
Answer:
$10.00 per hour
Step-by-step explanation:
Overhead application rate which is also known as overhead absorption rate on the basis on labor hours is the total budgeted overhead for 2019 which is $900,000 divided by the expected production of 90,000 labor hours for the year.
overhead application rate=$900,000/90,000=$10 per hour
This implies that for every one hour worked overhead cost of $10 would be added to the other costs incurred.
The correct option then is the third option of $10.00 per hour