Answer:c=b^a
Step-by-step explanation:
Logb c=a
In exponential form
c=b^a
Answer:
0.13093
Step-by-step explanation:
Give. That :
Population mean = 40% = 0.4
Sample size (n) = 64
Probability that more than 30 have computer at home
Mean = np = 64 * 0.4 = 25.6
Standard deviation = sqrt(n*p*(1-p)) = 3.919
P(x > 30)
USing the relation to obtain the standardized score (Z) :
Z = (x - m) / s
Z = (30 - 25.6) / 3.919 = 1.1227353
p(Z < 1.122) = 0.13093 ( Z probability calculator)
Answer:
<h2>
240.34</h2>
Step-by-step explanation:
ΔA = 90° - 31°
= 59°
sin A = perpendicular ÷ base
sin 59° = 400 ft ÷ y
1.6643 = 400 ft ÷ y
y = 400 ÷ 1.6643
y = 240.34 ft
<h2>
MARK ME AS BRAINLIST</h2>
Answer: No, it is not a solution
==========================================================
Explanation:
The point (3,-4) means that x = 3 and y = -4 pair up together
Let's plug these x,y values into each equation
Starting with the first equation, we get,
y = 4x-16
-4 = 4(3)-16 ... x replaced with 3; y replaced with -4
-4 = 12-16
-4 = -4 .... this is a true statement
Repeat for the second equation
y = 2x-6
-4 = 2(3)-6
-4 = 6-6
-4 = 0 ... this is false
Since we get a false statement, this means (3,-4) is not on the line y = 2x-6, which means that overall (3,-4) is not a solution to the system of equations. The point (3,-4) must make both equations true for it to be a solution.
Step-by-step answer:
standard deviation (sigma) = 12 inches
mean (mu) = 90 inches.
For 36 years, the standard error of the mean is
e = sigma / sqrt(n) = 12" / sqrt(36) = 2".
Deviation from the mean
= 92.8 -90 = 2.8
Since the standard error of the mean follows the normal distribution, we have
Z=(92.8-90)/2 = 1.4
Looking up the normal distribution tables, or check R, we find
P(Z>1.4) = 1-P(Z<1.4) = 1-0.9192433 = 0.08075666
Answer: P(snowfall>92.8) = 0.0808 (to four decimal places)