Answer:
the required probability is 0.09
Option a) 0.09 is the correct Answer.
Step-by-step explanation:
Given that;
mean μ = 7
x = 4
the probability of exactly 4 bridge construction projects taking place at one time in this state = ?
Using the Poisson probability formula;
P( X=x ) = ( e^-μ × u^x) / x!
we substitute
P(X = 4) = (e⁻⁷ × 7⁴) / 4!
= 2.1894 / 24
= 0.0875 ≈ 0.09
Therefore the required probability is 0.09
Option a) 0.09 is the correct Answer.
(20)(7) = 140 hours per week
(20)(365) = 7300 hours per year
Answer:
y= 2/3x - 2
Step-by-step explanation:
b is were the line crosses the y intercept so its -2
and the slope is 2/3x
hope this helps:)
C = 4500 + 150s
4500 is fixed, so what remains is just 150$ per ton of sugar (so 150 x s)
If we substitute 12 for s we get:
C = 4500 + 150*12
C = 6300
The answer is: not likely. There isn’t much of a chance !