Answer:
20 days
Step-by-step explanation:
It takes 12 men 5 days to complete a job. Work out how many days it would take 3 men to complete the same job.
12 * 5 = 60
60/3 = 20
It will take 3 men 20 days to do the same job
Answer:
The speed of the boat in still water is 18 mph.
The speed of the current is 2 mph
Step-by-step explanation:
Let x represent the speed of the boat in still water.
Let y represent the speed of the current.
When the boat goes against the current, the speed is 16 mph. Assuming it traveled against the current while going upstream, its total speed would be (x - y) mph. It means that
x - y = 16 (equation 1)
Going downstream, the boat averages 20 mph. Assuming it traveled with the current, its total speed would be (x + y) mph. It means that
x + y = 20 (equation 2)
Adding both equations, it becomes
2x = 36
x = 36/2
x = 18 mph
Substituting x = 18 into equation 1, it becomes
18 - y = 16
y = 18 - 16
y = 2 mph
All of them??? or just one
The length/width ratio is 3/1
.
<em>l</em> = 6.6 × 10⁻⁶ m; <em>w</em> = 2.2 × 10⁻⁶ m
<em>l</em>/<em>w</em> = 6.6 × 10⁻⁶ m/2.2 × 10⁻⁶ m = 3/1