Digital subscriber line is a means of transferring high bandwidth data over a telephone line. Such data could be a voice call, graphics or video conferencing. DSL uses a user's existing land lines in a subscriber's home, allowing users to talk on a telephone line while also being connected to the Internet. In most cases, the DSL speed is a function of the distance between a user and a central station. The closer the station, the better its connectivity.
Answer:
The correct answer is C) With respect to PERT and CPM, slack is the amount of time a task may be delayed without changing the overall project completion time.
Explanation:
The CPM (Critical Path Method) method is frequently used in the development and control of projects whose tasks have a fixed duration while the PERT (Program Evaluation and Review Techniques) method is a set of techniques with the same purpose but that allows to work with tasks with estimated probability duration but not deterministic.
Both methods are based on developing a complete scheme that includes all the tasks of a project linked to each other according to their sequence, determining the duration and analyzing different ways of reconfiguring the task planning to optimize the use of the resources of according to the general objectives of the project.
There are tasks that to start performing them must have been completed one or more previous tasks. The overall duration of the project is determined by the Critical Path, which is the sequence of tasks of greater duration. The tasks belonging to the critical path have to be carried out with special care because delays in them would cause delays in the total achievement of the project. That is why these tasks have no slack.
The rest of the tasks have some slack, which is determined by the time that a previous task can be delayed without delaying the total time of completion of the project, that is, not exceeding the duration determined by the critical path.
That is that why we say that the <em>slack</em><em> is the amount of time a task may be delayed without changing the overall project completion time</em>.
Answer:
If all the character pairs match after processing both strings, one string in stack and the other in queue, then this means one string is the reverse of the other.
Explanation:
Lets take an example of two strings abc and cba which are reverse of each other.
string1 = abc
string2 = cba
Now push the characters of string1 in stack. Stack is a LIFO (last in first out) data structure which means the character pushed in the last in stack is popped first.
Push abc each character on a stack in the following order.
c
b
a
Now add each character of string2 in queue. Queue is a FIFO (first in first out) data structure which means the character inserted first is removed first.
Insert cba each character on a stack in the following order.
a b c
First c is added to queue then b and then a.
Now lets pop one character from the stack and remove one character from queue and compare each pair of characters of both the strings to each other.
First from stack c is popped as per LIFO and c is removed from queue as per FIFO. Then these two characters are compared. They both match
c=c. Next b is popped from stack and b is removed from queue and these characters match too. At the end a is popped from the stack and a is removed from queue and they both are compared. They too match which shows that string1 and string2 which are reverse of each other are matched.
This link should help: https://uhasct.com/insert-an-empty-row-between-each-row-of-data-in-excel/