Mr. Vella can build the wall in 4 days, however only works on it for 3 days. That means that he has completed 75% of the and is leaving 25% for his apprentice.
We need to figure out how long it takes the apprentice to build 25% of a wall. We know he can build 100% of a wall in 6 days, so dividing 6 days by 4 will give us our answer.
6/4 = 3/2 = 1.5 days
It took the apprentice 1.5 days to finish the wall.
Simple interest is basically the cost of borrowing money over a period of time. So if you have borrowed $110.00 at 5% for two years, you will multiply the 5% by the two years (presuming that it is 5% annual percentage rate (APR). So, You will multiply the 110 by 10% (or .1) to get $11 dollars of simple interest.
Answer:
Step-by-step explanation:
Vertex A of the triangle ABC when rotated by 90° counterclockwise about the origin,
Rule to be followed,
A(x, y) → P(-y, x)
Therefore, A(1, 1) → P(-1, 1)
Similarly, B(3, 2) → Q(-2, 3)
C(2, 5) → R(-5, 2)
Triangle given in second quadrant will be the triangle PQR.
If the point P of triangle PQR is reflected across a line y = x,
Rule to be followed,
P(x, y) → X(y, x)
P(-1, 1) → X(1, -1)
Similarly, Q(-2, 3) → Y(3, -2)
R(-5, 2) → Z(2, -5)
Therefore, triangle given in fourth quadrant is triangle XYZ.
Answer:

Answer C is correct.
Step-by-step explanation:

hope this helps
brainliest appreciated
good luck! have a nice day!