1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Vlad [161]
3 years ago
8

Plz help will mark brainliest if correctly answered ​

Mathematics
2 answers:
mars1129 [50]3 years ago
7 0
Umm i think it’s C lol
elena-14-01-66 [18.8K]3 years ago
5 0
C I am sorry if I am wrong
You might be interested in
In order to efficiently bid on a contract, a contractor wants to be 95% confident that his error is less than two hours in estim
Sonja [21]

Answer:

Step-by-step explanation:

Given that in order to efficiently bid on a contract, a contractor wants to be 95% confident that his error is less than two hours in estimating the average time it takes to install tile flooring.

Std deviation =4.5 errors

95% confidence interval = Mean±1.96*std dev

Hence we have

1.96(\frac{4.5}{\sqrt{n} } )

\sqrt{n} \geq 4.41\\n\geq 19.4481

Sample size should be 20.

8 0
3 years ago
What is 691/1000 in simplest form?
puteri [66]
691/1000 is already in its simplest form, for 691 is a prime number and it cannot be reduced by any number other than 1 and 691. (and 1000 is not divisible by 691 also)

691/1000 in its simplest form is 691/100~

7 0
3 years ago
Read 2 more answers
The following data points represent the number of snow days each school district in Mill County had last
stepladder [879]

Answer:

median number of snow days is 4

Step-by-step explanation:

Listed in order from least to greatest:

2

3

3

3

4

5

6

7

8

There are 9 numerals on this list.  Because this count is odd, the median is simply the middle value, which here is 4.  This is the median number of snow days.

4 0
3 years ago
how to is the tree that cast a shadow of 320 centimeter long and john who is majoring the tree is 180 centimeter tall and cast a
Nikolay [14]
Ok so ratios
john casts a shadow of 180 when he is 180
therefor shadowheight=realheight
320shadowheight=realheight


realheight=320centimeters
7 0
3 years ago
An office building has a cement block under its dumpster. The pad has an area of 108 square feet. The dumpster is 9 ft long and
juin [17]

Answer:

Most likely Perimeter of the pad is 42 ft.

Step-by-step explanation:

Area of the Cement pad = 108 feet²

Length of the dumpster = 9 ft

Width of the dumpster = 8 ft

Cement pad surface is greater than dumpster to hold it.

Area of pad = 108 ft²

length × width = 108

we choose length and width such that they are greater than length and width of the dumpster.

So, length of the pad = 12 ft

Width of the pad = 9 ft

Thus, Perimeter = 2 × (length +  width) = 2 × ( 12 + 9 ) = 2 × 21 = 42 ft

Therefore, Most likely Perimeter of the pad is 42 ft.

5 0
3 years ago
Other questions:
  • In the algebraic expression 7/y, what is the coefficient of y? Explain
    15·1 answer
  • Please help!! (I have put a screenshot of the question)
    7·1 answer
  • see I was genius in my country india website and here no one is answering me when I am in so hurry you know. I am losing marks h
    5·2 answers
  • Hari's weekly allowance varies depending on the number of chores he does. He received $20 in allowance the week he did 10 chores
    15·2 answers
  • 40 points + brainliest. Please solve using deductive geometry step by step.
    9·1 answer
  • Helppp pleaseee I don’t understand
    7·1 answer
  • Geometry: please only comment if you know the answer I need help with this please
    9·1 answer
  • If jill and katie share 42 chocolates in the ratio of 3:4 then how may chocolates does jill get?
    9·1 answer
  • Help please. Very easy
    7·1 answer
  • The equation of a line is y=4x+3/2, what is the slope of a line that is perpendicular to this line?
    10·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!