If the 3 points are collinear, then the slopes of all line segments connecting the points are the same.
Thus,
-6 - (-8) 2
m = ------------- = -------- = -1/2
-7 - (-3) -4
Then the following must be true:
4-(-6) 10
-1/2 = ------------ = ---------
c - (-7) c + 7
Cross multiplying, -(c+7) = 20, and c+7 = -20, so that c = -27
Answer:
Your answer should be -8.
Answer:
F
Step-by-step explanation:
Answer:
327
Step-by-step explanation:
Calculation for How large of a sample would be required in order to estimate the mean per capita income
First step is to find z 80% confidence level
At 80% confidence level the z will be:
α/2 = 1 - 80% = 1 - 0.80 = 0.20
α/2= 0.20 / 2 = 0.01
Zα/2= Z0.01= 1.28 from z table
Now let calculate the Sample size using this formula
Sample size = n= [( Zα/2* σ ) / E]^2
Let plug in the formula
n = (1.28*7.9/0.56)^2
n= 326.06
n=327 (Approximately)
Therefore How large of a sample would be required in order to estimate the mean per capita income will be 327