Answer: review; quality
Explanation:
SQA refers to the ongoing process that can be found in the Software Development Life Cycle whereby the developed software is checked in order to ensure that the desired quality measures are met. The SQA processes is vital as it checks for the quality in every development phase.
The first step of the SQA process is to (review) the software development process. The next step is to set (quality) attributes.
Answer:
The solution for the current situation in which Skylar is viewing her personal and business calendar in a side-by-side fashion, but she would like to view a single calendar that has appointments and meetings from both personal and business. is:
Configure the Overlay option.
Explanation:
The reasons behind this answer are that in the first place, creating another calendar is too much work. In the second place, the share of the calendars is not going to help her because that would only allow someone else to watch her calendars. However, using the overlay option will allow her to mix them and create one calendar with all her information.
Answer: I think the answer would be 1/30 or 1/60
Explanation: Anything below 1/90 is considered a soft image so i would go with 1/30 Brainliest ans plz.
<em><u>Answer</u></em>
5 hours
<em><u>Explanation</u></em>
The two working together can finish a job in

Also, working alone, one machine would take one hour longer than the other to complete the same job.
Let the slower machine working alone take x hours. Then the faster machine takes x-1 hours to complete the same task working alone.
Their combined rate in terms of x is

This should be equal to 20/9 hours.

Multiply through by;





Factor to get:


It is not feasible for the slower machine to complete the work alone in 4/9 hours if the two will finish in 20/9 hours.
Therefore the slower finish in 5 hours.
A proxy server is a server that intercepts user requests from the internal secure network and then processes that request on behalf of the user.
The proxy server can be a computer or application program<span> that gets the requests from clients and seeks resources from other </span>servers. It is a <span>intermediary point between the end user and the backbone network.</span>