1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
DaniilM [7]
3 years ago
12

A. acute; 45 B. Acute; 55 C. Obtuse; 135 D. Obtuse; 45

Mathematics
1 answer:
xxMikexx [17]3 years ago
6 0
It’s A, if you add 70 and 65 you get 135 and 180-135=45 :)
You might be interested in
This table shows a value that represents an exponential function what is the average rate of change for this function for the in
aliya0001 [1]

Answer:

Option A is correct, i.e. 12.

Step-by-step explanation:

Given is the table of x&y relationship which represents an exponential function.

The average rate of change for a function can be found using the following formula:-

F_average = { f(b) - f(a) } / (b-a)

Given a = 3 and b = 5.

From the table, f(3) = 8 and f(5) = 32.

So, F_average = (32-8)/(5-3)

F_average = 24/2 = 12.

Hence, option A is correct, i.e. 12.

4 0
3 years ago
What’s a equivalent ratio
Leni [432]

Ratios that are equivalent to each other are considered equivalent ratios. For example, 2:6 is equal to 6:18

6 0
3 years ago
Read 2 more answers
What is the last step in constructing an angle?
KATRIN_1 [288]

Answer:

O Connect the endpoint and the mark at the angle measure

Step-by-step explanation:

Check the illustration for more details.

5 0
2 years ago
There are four steps in the manufacturing process of a stuffed toy: cutting, stuffing, sealing, and packaging. There are two emp
Anit [1.1K]

Answer:

(a) 2min/15units

(b) 1min/20units

(c) The bottleneck stage is cutting. The process capacity is 450units/hour

(d) The capacity of the new employee should be 1unit/2sec. The process capacity will increase four times

Step-by-step explanation:

(a) Cycle time for stage cutting for 2 employees = 16sec/2units × 1min/60sec = 2min/15units

(b) Cycle time for stage sealing for 1 employee = 3sec/1unit × 1min/60sec = 1min/20units

(c) Process capacity of stage cutting = 15units/2min × 60min/1hour = 450units/hour

(d) If the capacity of the new employee is 1unit/2sec, the process capacity = 1unit/2sec × 3600sec/1hour = 1800units/hour. The process capacity increases 4 times (1800/450 = 4)

7 0
3 years ago
Ed plants trees in city parks. He used 1\10 of a bag of fertilizer around the base of a newly planted tree. How many trees can E
valina [46]
To determine this you could think of it in a couple ways.

1. If it takes 1/10 of a bag of fertilizer to put around 1 tree, he can fertilize 10 trees with 1 bag because there are 10 groups of 1/10 in a bag. Take 10 x 40 because there are 40 bags and get 400 trees to be fertilized.

2. You can divide 40 by 1/10 as the other strategy.
This is the same as 40 x 10/1.

Also equaling 400 trees that can be fertilized.
4 0
3 years ago
Other questions:
  • Sienna is solving the quadratic equation by completing the square.
    14·2 answers
  • 1/4,1/12,1/36,1/108 Describe the pattern for the sequence. Then find the next three terms
    11·1 answer
  • What is 0.35 as a mixed number or fraction is simplist form
    15·1 answer
  • Solve x:<br> 9 - 4x = -35<br> --Please Help! This is homework due in for Monday! Xx
    11·2 answers
  • Find the area of the composite shape shown below
    15·1 answer
  • Trigonometry help please
    11·1 answer
  • Put this on order from greatest to least pls​
    6·1 answer
  • I want answer for this one
    9·2 answers
  • Find (a) the circumference and (b) the area of the circle. Use $3.14$ or $\frac{22}{7}$
    13·2 answers
  • Make y the subject of this formulae X=a-2by^2
    12·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!