Credit, capacity, collateral, and capital
6.4%
200 from the 5% of 4000
140 from 4% on 3500
160 on 6.4% on 2500
D Bc it is d is why it is d is correct
Answer:
Results are below.
Explanation:
<u>To calculate the activities rates, we need to use the following formula:</u>
Predetermined manufacturing overhead rate= total estimated overhead costs for the period/ total amount of allocation base
Designing= 452,795 / 11,900= $38.05 per designer hour
Sizing and cutting= 4,231,150 / 157,000= $36.95 per machine hour
Stitching and trimming= 1,501,000 / 79,000= $19 per labor hour
Wrapping and packing= 327,050 / 31,000= $10.55 per finished unit