1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Vika [28.1K]
3 years ago
13

You need to split it in half then multply then add

Mathematics
1 answer:
rusak2 [61]3 years ago
8 0

Answer:

100 ft^2

Step-by-step explanation:

The large upper rectangle has dimensions 12 ft by 23 ft, and thus has area 276 ft^2.  The small lower rectangle is 15 ft by (12 - 7) ft,  or 15 t by 5 ft, and thus has area 75 ft^2.  The total area is

75 ft^2 + 25 ft^2, or 100 ft^2.

You might be interested in
What is the compound interest of 10400 at 12.7% for 4 year
Naddik [55]

The Compound Interest of 10400 at 12.7% for 4 years is 6378.

The principal amount is given as 10400.

The rate of interest is given as 12.7%.

The time period to be calculated is given as 4 years.

The compound interest for the given above is to be calculated.

<h3>What is compound interest?</h3>

Compound interest is the interest that we earn both on the principal amount and the interest we earn.

The formula used to calculate compound interest is:                                  

   P [ (1 + \frac{R}{100} )^n - 1 ]

Where P = principal amount, R = rate of interest, and n = number of years.

We have,

P = 10400

R = 12.7%

n = 4 years

Compound interest:

P [ (1 + \frac{R}{100} )^n - 1 ]\\\\10400 [ (1 + \frac{12.7}{100} )^4 - 1 ]

Now,

10400 [ ( 1 + 0.12.7 )^2 - 1 ]

10400 [ 1.127^4 - 1 ]

10400 [ 1.61322 - 1 ]

10400 x 0.6132

6377.56

Rounding to the nearest whole number.

We have,

Compound Interest = 6378.

Thus the Compound Interest of 10400 at 12.7% for 4 years is 6378.

Learn more about Compound Interest here:

brainly.com/question/13155407

#SPJ1

8 0
2 years ago
Can someone help me with these please?
saul85 [17]

Point-slope form: y-y1 = m(x-x1)

Standard form: ax + by = c

Slope-intercept form: y = mx+b


Start by finding the slope. We know it is negative since the line is decreasing. The slope is -4/3.


To create point-slope form, we need to get one point from the graph. Let's use (3,0).

y = -\frac{4}{3}(x-3)


To create slope-intercept form, we need the slope and the y-intercept. The y-intercept is the point where our equation crosses the y-axis. For this equation, it is 4.

y = -\frac{4}{3}x + 4


To get standard form, solve the equation in terms of C.


Point-slope form: y = -4/3(x-3)

Slope-intercept form: y = -4/3x + 4

Standard form: 4/3x + y = 4



7 0
4 years ago
Please help <br><br>y≥1/3x-3​
zloy xaker [14]

Answer:

B, the one with the line and shaded the top on the right side. (The one that goes to 7 on the x axis).

Step-by-step explanation:

First I find which graph as y -intercept of -3, which is all of them.

Next, I find with graph has a slope of 1/3. (rise 1 run 3). Only B and D has a slope of 1/3 (The ones that has a less steep graph. )

Then, I use the coordinate (0,0) to see which side the graph shades. I plug it into the inequality. (0)≥1/3(0)-3​. Solve. Is 0 greater than -3. YES! so we shade the part where (0,0) is shaded which is B.

6 0
3 years ago
Question 3 of 8
erastova [34]

Answer:

A. and C.

Step-by-step explanation:

We don't know the area of the roof or the number of people in the group so they would both be represented by variables in an equation.

6 0
3 years ago
n automatic machine in a manufacturing process is operating properly if the lengths of an important subcomponent are normally di
Paraphin [41]

Answer:

0.3557 = 35.57% probability that one selected subcomponent is longer than 118 cm.

Step-by-step explanation:

Normal Probability Distribution:

Problems of normal distributions can be solved using the z-score formula.

In a set with mean \mu and standard deviation \sigma, the z-score of a measure X is given by:

Z = \frac{X - \mu}{\sigma}

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the p-value, we get the probability that the value of the measure is greater than X.

Normally distributed with a mean of 116 cm and a standard deviation of 5.4 cm.

This means that \mu = 116, \sigma = 5.4

Find the probability that one selected subcomponent is longer than 118 cm.

This is 1 subtracted by the pvalue of Z when X = 118. So

Z = \frac{X - \mu}{\sigma}

Z = \frac{118 - 116}{5.4}

Z = 0.37

Z = 0.37 has a pvalue of 0.6443

1 - 0.6443 = 0.3557

0.3557 = 35.57% probability that one selected subcomponent is longer than 118 cm.

8 0
3 years ago
Other questions:
  • (02.02)Line segment EF is shown on a coordinate grid: A coordinate plane is shown. Line segment EF has endpoints negative 3 comm
    7·2 answers
  • Anyone know the answer?
    6·1 answer
  • Y=-4x+2<br> y = 6.x-8<br><br> I don’t understand
    15·1 answer
  • What is the solution of the inequality shown<br> below?<br> c+2 &lt; -1
    11·1 answer
  • What is the probability a customer ordered a small, given that he or she ordered a hot drink?
    13·2 answers
  • PLEASE HELP ME ASAP I AM BEGGING YOU. NO SPAM ANSWERS. Find the perimeter of the shaded regions below. Give your answer as a com
    11·2 answers
  • Use the distance formula to find distance between two points. Need help on this ASAP.
    13·1 answer
  • Order the events from least likely (1) to most likely (4)<br><br> PLEASE HELP MEEE:)
    13·1 answer
  • A survey in one middle school showed that 4 out of 9 students help cook meals at home. Predict how many out of the 720 students
    12·1 answer
  • Which event is unlikely, but not impossible?
    8·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!