Answer:
- 1 1/14 seconds
- 4 2/7 seconds
Step-by-step explanation:
We are being asked for times, so we can express the rate in terms of seconds per meter.
(15 seconds)/(14 meters) = (15/14) seconds per meter = 1 1/14 seconds/meter
__
1) It will take Robot A 1 1/14 seconds to go 1 meter.
2) it will take Robot A 4 2/7 seconds to go 4 meters. (4 times as long)
Answer:
x-9
Step-by-step explanation:
"Less than" switches the way of the expression.
If the "less than" was not there it would have been:
9-x
"Less" means subtract so you would subtract x from 9.
Hope this helped!
Slope = rise/run
slope = 3/12
slope = 1/4
answer is
<span>1/4</span>
I'm guessing this is a question about interest rates? If you have $20 that increases by 4% in one year, you need to multiply 20 by 1.04. This gets you $20.8.
If you are talking about compound interest, we will take this number and multiply it again by 1.04 for the second year. 20.8 x 1.04 = $21.632.
If it is instead simple interest, we will simply add another .8 dollars for each year, instead of getting 4% interest compounded every year onto the new value. This gets you $21.6.